Post-construction cleaning

When the the home has been built and the dust settles, you'll need a reliable team of cleaning professionals to make the home look spotless! Give us a call! Our team of experts will clean your site to perfection and leave it irresistible to the future homeowner. Contact us now to book your cleaning appointment. 

Construction Site

Phase 1: rough clean

The purpose of the Rough Clean Phase is to remove a bulk of the construction debris and prepare the site for further cleaning.

 

 The Rough Clean Phase includes the following:

 

 

  • Removal of large items items such as debris, trash, leftover materials and other items that cannot be vacuumed. Removal of protective coverings and stickers from floors, windows and other surfaces. 

  • Dusting including high dusting of ceilings, light fixtures and ceiling fans. All surfaces including walls, baseboards and ledges, windowsills, door frames and trim are dusted as well. 

  • Vacuuming of all carpeted areas is done using a HEPA filter to minimize airborne dust.

  • Floor cleaning including sweeping and mopping of all floors. Buffing and polishing floors will be completed if needed. 

  • Window and glass cleaning involves cleaning of all windows inside and out. Mirrors and glass fixtures are cleaned. 

phase 2: light (detailed) clean

 The purpose of the Light/Detailed Clean Phase is to focus on the detailed cleaning of the interior spaces. 

 

The Light Clean (or Detailed Clean) Phase includes the following: 

 

 

  • Wipe inside and out of cabinets and drawers and clean cabinet hardware.

  • Clean and disinfect countertops.

  • Wipe down backsplashes.

  • Clean interior and exterior of all appliances.

  • Ensure appliances are free of construction dust and debris.

  • Scrub and polish kitchen sinks.

  • Clean and disinfect faucets.

  • Clean tiles and grout in showers, bathtubs and floors.

  • Clean and polish all bathroom fixtures.

  • Clean and disinfect toilets inside and out.

  • Clean and polish bathtubs and shower enclosures.

  • Ensure all caulking is free of debris and in good condition.

  • Clean vanity tops and mirrors.

  • Wipe down inside and outside of cabinets and drawers.

  • Clean and dust all light fixtures.

  • Ensure all light bulbs are functioning.

  • Dust and clean closet shelves, rods and floors.

Cleaning the Table
Cleaning Supplies

Phase 3: Final (Touch-Up) Clean

The purpose of the Final (Touch-Up) Clean is to ensure that the site is ready for occupancy and addresses any remaining construction dust and minor debris.

 

The Final (Touch-Up) Clean Phase includes the following:

  • Wipe down all doors, door frames, and handles

  • Ensure no paint or construction debris is left on all surfaces.

  • Clean all air vents and replace filters if necessary.

  • Dust and vacuum around HVAC registers and grilles.

  • Inspect all cleaned areas to ensure spots are missed. 

  • Check for any leftover construction materials or debris.

  • Use air purifiers or fresheners to eliminate any residual construction smells.

  • A final walkthrough is conducted with the client to ensure satisfaction. 

mystic magic cleaning services

Clean Spaces, Clear Minds

Head Office
Operating Hours

5625 N German Church Rd, 2051, Indianapolis, IN 46235

Mon - Fri: 12am - 11:59pm
​​Saturday: 12am - 11:59pm
​Sunday: 12am - 11:59pm

  • Facebook
  • Yelp!

© 2025 by Mystic Magic Cleaning Services. Powered and secured by Wix

bottom of page